Roof leak? Call 405-795-8700 anytime.

Open 24/7 · OK Roofing Reg. #80006558

Roof replacement

Solar panels before a reroof in Midwest City

· 5 min read · Kale Kahre

Solar panels on a shingle roof of a brick home before a reroof in Midwest City, Oklahoma.

A roof under solar panels cannot be replaced while the array is still bolted through it. On a reroof in Midwest City, the solar panels had to come off before work on the new roof could start. That is the whole published fact about the solar on that house. This note does not say who took the panels off, who put them back, or what hardware was used. Prestige Roofing is the roofing contractor. The solar warranty question belongs with the company that installed the system.

Why the panels have to come off

Shingles, underlayment, and flashing sit under the array. The rails and lag bolts that hold the panels are fastened into the roof. A crew cannot tear off the old shingles, look at the deck, or install a new roof in the footprint of those rails without moving the array. Leaving the panels in place and roofing around them leaves the old roof under the rails and makes the penetrations impossible to flash as part of the new system.

On this Midwest City house, that sequence was required: panels off, then the roof. The photo shows the panels still on the shingle roof, which is the condition before that removal. It is not a picture of the removal, and it is not a picture of the finished roof.

Midwest City does not have its own city page. It is on the service area list with the Oklahoma City office. The nearest dedicated page is roofing in Oklahoma City. The same residential crews cover Edmond, Norman, Moore, Yukon, and Mustang.

The warranty check comes first

Before anyone touches the panels, the homeowner should call the original solar installer. Kale’s note on this job is specific: check with that installer so the solar warranty is not voided by using another company.

Many solar warranties cover the panels, the inverter, and the workmanship of the original installation. Some of those warranties say the array has to be removed and reinstalled by the original company, or by a firm they approve, or the coverage changes. A roofing crew that is good at roofs is not automatically the company your solar contract allows on the array. Using a different company to remove or reinstall the panels can void the solar warranty. That is a solar-contract question, not a guess a roofer should make for you.

Ask the installer, in writing if you can:

  • Whether removal and reinstall for a reroof is allowed
  • Who is permitted to do that work without changing the warranty
  • Whether they want to schedule it themselves
  • What they need from the roofing contractor, such as the dates the roof will be open

Prestige did not publish, for this Midwest City house, that Prestige removed the panels or reinstalled them. Do not read this page as that claim. The roofing plan has to wait on whatever the solar installer requires.

What to line up before the roof is scheduled

A reroof with solar on it is two schedules, not one. The roof cannot start until the array is off. The homeowner is usually the person who has the solar contract, so the homeowner makes that call. Prestige can help plan the reroof around the solar. The planning conversation is about the roof: access, the tear-off, and when the new roof will be ready for the array to return.

Useful things to have before anyone sets a start day:

  • The solar installer’s answer on who may remove and reinstall the system
  • A date the panels will be off the roof, from whoever is allowed to take them off
  • A clear statement of whether the array goes back on the same day the roof is finished or later
  • Photos of the array from the ground, so you have a record of how it sat before it moved

Roof inspections are free for homeowners in the Oklahoma City metro, with no obligation. An inspection is how you learn whether the roof is a repair or a replacement. If solar is on the house, say so when you book. The crew needs to know the array is there before talking about a tear-off.

If the inspection shows the roof can be repaired without disturbing the rails, that is a different job, and it should be said that way. If the shingles under and around the array are used up, the panels have to come off first. There is no honest way to “replace the roof” and leave the bolted portion on the old system.

What homeowners can see without climbing

Stay off the roof. Do not unbolt panels, lift rails, or pull flashing to look underneath. From the ground and from inside, you can still gather what a roofer needs.

Look for stains on the ceilings under the array, especially after wind-driven rain. Note whether the marks line up with a bathroom, a hallway, or an attic access. Granules in the gutters on that slope, and shingle pieces in the yard after a storm, are worth photographing. So is a panel that sits visibly lower than the others, or a rail that no longer looks parallel to the ridge. Those are clues. They are not a diagnosis, and they are not permission to start disconnecting the system.

Do not assume a stain under the array means the panels failed. It can be a pipe boot, a flashing, or a shingle just outside the rails. Do not assume a clean ceiling means the roof under the panels is sound. The deck under an array is the part you cannot see from the yard.

How Prestige fits, and how it does not

Prestige Roofing replaces and repairs residential roofs. On a house with solar, the help we can put in writing is the roof plan: inspect, say whether it is a repair or a reroof, and schedule the roof work for when the array is off if it has to come off. We are happy to plan a reroof around your solar. We are not the solar installer, and this page does not claim the solar removal or the reinstall on the Midwest City house.

If your original installer will do the removal, the usual order is their date first, then the roof, then their return trip when the new roof can take the rails. If they tell you another company is allowed, get that in writing before anyone schedules the lift. If they tell you only they can touch the array, that answer controls the solar work even when it slows the roof.

Call 405-795-8700 or use the inspection request. Say you have solar and which city the house is in. Midwest City jobs are scheduled from the Oklahoma City office. The phone line is open 24/7 if water is already coming in. An active leak is still a roof emergency. It is not a reason to pull panels yourself while you wait.

The Midwest City photo stays what it is: panels on the roof before the reroof could start. The next step for a homeowner in the same situation is the call to the original solar installer, then a roof inspection.

midwest-citysolarreroof Roof replacement

Related: Roof replacement Roof inspections Oklahoma City

Keep reading

Valley metal on a Yukon roof

On a Yukon roof, valley metal is in place where two slopes meet. Why that metal matters, what you can see from the ground, and when to ask for an inspection.

Signs your OKC roof needs replacement

The signs Prestige uses to tell an Oklahoma City repair from a replacement, including age, leaks, sagging, and hail, plus what a tear-off includes.

Call Free estimate